Lyon Township Hall Renovation and Expansion

Lyon Township Hall and Sheriff’s Office

Jodi Trisdale

Lyon Township is located in Oakland, MI.  This project involves improvements to the Township Hall, Sherriff’s Office and the site.  The Township Hall Office includes a 5000 SF addition with a full basement and a complete renovation of the existing office space.  The expansion provides much needed office and lunchroom space.   The enhancements to the existing building include new paint, …

Vision Source

Main Street Optometry: Vision Source

Jodi Trisdale

Vision Source is an interior renovation project of an existing building, located in downtown Pinckney.  This project consists of a large welcoming reception area with private business offices, a coffee bar and staff lounge.  Incorporated in the design is an open concept for the optical and adjustment center, as well as, 3 patient exam rooms and 1 specialty testing area. …

UIS New Construction

Utilities Instrumentation Services

Jodi Trisdale

Utilities Instrumentation Services (UIS) project is a 20,000 SF new corporate headquarters located in Dexter, MI.  The building includes 10,000 SF of warehouse and 10,000 SF of office space.  The structure is ground-up construction for a single-story, masonry bearing building with large windows and decorative masonry block.  Insulated metal sandwich panels are installed on the perimeter warehouse walls.  Large electrical …

Ube Machinery Expansion

Ube Machinery Expansion

Jodi Trisdale

Ann Arbor, MI 22,500 SF Expansion for a 60 metric ton crane Installed transfer cart rail system

Rendering of Grandview Commons Condominium

Grandview Commons Condominiums

Jodi Trisdale

Grandview Commons Condominiums is a redevelopment project that is located near downtown Dexter, MI.  Previously, the site was home to an 82,000 SF manufacturing company that sat vacant for years.  Construction began with the demolition of the manufacturing building, brownfield cleanup, extensive site work, underground utilities and improvements to the City of Dexter’s infrastructure. This project consists of 3-phases, 76 …

Variety Die Tool and Stamping Addition

Variety Die & Stamping Addition

Jodi Trisdale

Dexter, MI 29,350 SF Building Addition New Loading Dock Pre-Engineered Metal Building, PEMP Progress Photos

Doors and Drawers Expansion

Doors and Drawers Expansion

Jodi Trisdale

Dexter, MI 6165 SF Warehouse and Manufacturing Expansion Fully Suppressed Building   Progress Photos    

A.R. Brouwer Company

2830 Baker Road Office Building

Jodi Trisdale

Dexter, MI 9170 SF Complete Interior and Exterior Renovation, Including Demolition and Building Addition Exposed Barrel Roof and Trusses Final Exterior Photos Interior Photos Coming soon…   Progress Photos Watch the Video of the Building Renovation

Purple Rose Roof Renovation

Purple Rose Theatre – Roof Renovation

Jodi Trisdale

Chelsea, MI Raised roof to accommodate more ceiling space for theater performances, approximately 1000 SF Replaced HVAC equipment Two-phase project to accommodate scheduled performances and fundraising for the renovation The Michigan Council for Arts and Cultural Affairs, MCACA, awarded a grant to Purple Rose matched by private support to complete Phase I-II  Photos      

Enterprise Used Car Building

Enterprise Rent- A- Car

Jodi Trisdale

Farmington Hills, MI 3500 sq. ft. new construction on existing developed site Underground detention system Final Photos Progress Photos