UIS New Construction

Utilities Instrumentation Services

Jodi Trisdale

Utilities Instrumentation Services (UIS) project is a 20,000 SF new corporate headquarters located in Dexter, MI.  The building includes 10,000 SF of warehouse and 10,000 SF of office space.  The structure is ground-up construction for a single-story, masonry bearing building with large windows and decorative masonry block.  Insulated metal sandwich panels are installed on the perimeter warehouse walls.  Large electrical …

Westgate Shopping Center Renovation

Westgate Shopping Center

Jodi Trisdale

Westgate Shopping Center is home to one of the oldest outdoor malls in Ann Arbor.  This project consisted of the structural and aesthetic renovation of the 1400 lineal feet of canopy for Westgate including new siding, sheathing, canopy lights, and new columns. Safety was a primary concern as businesses remained open, we worked closely with the owner and tenants to …

Lyndon Township Hall

Jodi Trisdale

Lyndon Township, MI 2800 SF Addition, including a Fire Truck Stall Interior and Exterior Renovation of Existing Building  

Aldi Grocery Building Renovations

Aldi Inc. Grocery Store #88

Jodi Trisdale

Oak Park, MI Interior renovation Major upgrades including replacing refrigeration/coolers and HVAC units, and update electrical system 2981 SF building addition Final Photos Progress Photos  

A.R. Brouwer Company

2830 Baker Road Office Building

Jodi Trisdale

Dexter, MI 9170 SF Complete Interior and Exterior Renovation, Including Demolition and Building Addition Exposed Barrel Roof and Trusses Final Exterior Photos Interior Photos Coming soon…   Progress Photos Watch the Video of the Building Renovation

Retail Commercial Contracting

Aldi Inc. Grocery Store #78

Jodi Trisdale

Redford, MI Interior renovation Major upgrades including replacing refrigeration/coolers and HVAC units, and update electrical system 1650 SF building addition Photos

Purple Rose Roof Renovation

Purple Rose Theatre – Roof Renovation

Jodi Trisdale

Chelsea, MI Raised roof to accommodate more ceiling space for theater performances, approximately 1000 SF Replaced HVAC equipment Two-phase project to accommodate scheduled performances and fundraising for the renovation The Michigan Council for Arts and Cultural Affairs, MCACA, awarded a grant to Purple Rose matched by private support to complete Phase I-II  Photos      

Timber Frame Barn

Real Life Barn

Jodi Trisdale

Timber Frame Barn – 12,700 square foot New Barn for Real Life Day Camp and Farm will Include: Demolition of existing barn Timber frame 3 Floors Elevator Stave silo (Elevator Shaft) Link to featured article in CAM Magazine Final Photos Progress Photos  

Weber’s Hotel

Chris Beecher

Renovation and remodeling of the historic Weber’s Hotel began in February of 2011. The project was divided into three parts, all of which were constructed simultaneously, and with business continuing to operate. Part I featured a new entrance to the hotel, boasting a dramatic Porte Cochere. Part II included remodeling the Habitat Lounge and Weber’s Restaurant entrance. Part III consisted of replacing all of the exterior …

Valicor

Valicor

Chris Beecher

A.R. Brouwer Company renovated an existing 36,000 square foot pre-engineered metal building to house Valicor’s corporate headquarters. The renovation included 12,000 square feet of office space and 12,000 square feet of research and development space. A geo-thermal heat system was installed in keeping with Valicor’s commitment to environmental sustainability. CLICK HERE for more Project Photos.