THE PROCESS of Design & Construction

 

[su_box title=”PRE-CONSTRUCTION” box_color=”#E42C1A” title_color=”#ffffff” radius=”0″ class=”mod1″] [su_row][su_column size=”1/2″]PROJECT CONCEPT[/su_column] [su_column size=”1/2″ style=”background: #DCD2D3;”]-Site selection
-Design Team Selection / Architect / Project Team*
-Discuss and Select Project Delivery Method / Contract Type
-Project Parameters / Feasability
*Assemble your Design & Construction Team as early as possible.
Cooperation is key / essential to your project’s success.[/su_column] [/su_row]

 

[su_row][su_column size=”1/2″]PLANNING and DESIGN DEVELOPMENT[/su_column] [su_column size=”1/2″]-Design Team has been selected
-Identify Required Functionality & Desired Aesthetics of the project
-Schematic Design / Design Development
-Preliminary Estimate
-Preliminary Schedule (consider weather, material availability, etc.)
-Site Plan approval
-Value Engineering
-Secure financing
-Construction Documents Finalized
-Final Project Budget / Contract[/su_column] [/su_row] [/su_box] [su_box title=”CONSTRUCTION” box_color=”#E42C1A” title_color=”#ffffff” radius=”0″ class=”mod1″] [su_row][su_column size=”1/2″]BIDDING and AWARD[/su_column] [su_column size=”1/2″]-Identify Subcontractor List for Bidding
-Send project out for bid to subcontractors
-Award subcontracts[/su_column] [/su_row] [su_row][su_column size=”1/2″]MOBILIZATION[/su_column] [su_column size=”1/2″]-Obtain necessary Permits and Insurance
-Finalize Project Schedule
-Coordinate Project Start-up items
(on-site storage, on-site office, safety plan, etc.)[/su_column] [/su_row] [su_row][su_column size=”1/2″]ACTIVE CONSTRUCTION at JOB SITE[/su_column] [su_column size=”1/2″]-Subcontractors are on-site and project is underway
-Field Supervision / Quality Control
-Subcontractor Management
-Change Order Management
-Local/County/State Inspections
-Cost Tracking (budget vs. actual)
*Cost Reports
-Schedule Tracking (schedule vs. actual)[/su_column] [/su_row] [/su_box] [su_box title=”CLOSEOUT” box_color=”#E42C1A” title_color=”#ffffff” radius=”0″ class=”mod1″] [su_row][su_column size=”1/2″]PROJECT CLOSEOUT and OCCUPANCY[/su_column] [su_column size=”1/2″]-Substantial Completion
-Final Inspections
-Certificate of Occupancy
-Punch List
-Closeout Documentation
(as-builts, manuals, warrantees, training, etc.)
-Final Billing
-Final Walkthrough with Owner
-Final Clean up[/su_column] [/su_row] [/su_box]